Bigfoot Systems® are pre-engineered footing forms used as pier footings with construction tubes. Manufactured from recycled high-density polyethylene (HDPE), Bigfoot can be used in all situations where pier footings are required. Bigfoot is used not only as a pier footing but also acts as an anchor to prevent uplift in areas subject to high-velocity winds. Because of this, our product has a superior advantage in areas subject to hurricanes. Other important features of Bigfoot Systems® Footing Forms: Easy one-day installation, saving time, money and aggravation. Traditional wooden form boxes can take up to three days to install. Engineered design offers footings with greatly increased stability, safety and convenience. Bigfoot’s advantage rests with its shape – a bell shaped footing with a round base – which uses the natural laws of physics to evenly distribute the entire load’s weight, solidly securing the footing to the earth, something a square footing just cannot do.




Marathon Drilling Co. Ltd. Fined 65,000 After Worker Injured

Ottawa, ON - Marathon Drilling Co. Ltd., a Greely, Ontario, construction company, was fined 65,000 for a violation of the Occupational Health and Safety Act after a worker was injured.

On October 7, 2010, the company was drilling at a construction project on Albion Rd. in Ottawa. The company was using a boom truck to lift and move construction materials needed for the drilling work. A worker was helping to place an auger being moved by the boom truck. The worker was holding the chains attaching the auger to the boom truck's hook when the truck came into contact with an overhead electrical conductor. The worker received an electric shock and was seriously burned.

A Ministry of Labour investigation found that the cable of the boom truck was too close to the overhead electrical conductor at the time of the incident.

Marathon Drilling Co. Ltd. pleaded guilty to failing to ensure that the cable of the boom truck was kept away from the overhead conductor by at least the minimum distance prescribed by the Ontario Regulation for Construction Projects.

The fine was imposed by Justice of the Peace Brian Mackey. In addition to the fine, the court imposed a 25-per-cent victim fine surcharge, as required by the Provincial Offences Act. The surcharge is credited to a special provincial government fund to assist victims of crime.

 

Court Information at a Glance

Location:                    Ontario Court of Justice

                                    161 Elgin St.

                                    Ottawa, ON

Judge:                         Justice of the Peace Brian Mackey

Date of Sentencing:    January 26, 2012

Defendant:                  Marathon Drilling Co. Ltd.

Matter:                        Occupational Health and Safety

Conviction:                 Ontario Regulation 213/91, Section 188(2)

Crown Counsel:          Linda Chen


PRINT STORY


 


SEARCH DATABASE          

Search

getlisted Friend us on Facebook Follow us on Twitter





Bigfoot Systems - logo ad 2 - 2016             button ad

Article - Construct-Ed



CALENDAR OF EVENTS
............................................................................................
Apr 03 - 05:  Water Technologies Symposium 2017
Apr 03 - 05:  SPAR 3D Expo & Conference
Apr 11 - 12:  Reshaping Energy 2017: Opportunit..
Apr 25 - 26:  ROOFTech 2017 - The Canadian Roof..
Apr 26:  Security Canada East

VIEW MORE

............................................................................................


TruWest - Skyscraper ad
TruWest - Logo ad


CWRE / MEC 2017 Button as


Eco Expo Asia 2017 - Logo Ad


OWMA - Logo ad




ISH Shanghai - Box Article ad CWRE / MEC 2017 Box ad